Refurbishment of the main Church and associated rooms was carried out.

Included the complete installation of a new Pre-Designed Heating system.

 

A new dedicated plantroom was installed and a steel pipework installation throughout with High quality cast Radiators and thermostatic control valves, along with BMS control Panel and associated Trend controls.